Global Success Stories

TongChuan China

LEARN MORE

Huelva 2021 Project: Spain

LEARN MORE
Australia arrows

AustraliaClare

128MW

Maximum wind speed level 17

The main challenge in this project was the wind speed. CLARE Solar Farm is located in Region C, this is a Cyclonic Region in Australia with 212 km/h (58,88 m/s) wind speed. The other critical issue was the ground composed by expansive clays with an active layer of 2 m in depth.

Huanghe arrows

ChinaHuanghe Hydropower

477MW

Gobi desert

nb88新博娱乐官方网址 Huanghe 477MW EHV Project faced the challenge of logistic due to COVID-19 which greatly increased the risk of delivery delay. To meet the original COD deadline, the extra shipping time was required. The solution of this pressure was real-time logistic tracking and adding 3 logistics suppliers.

Jordan arrows

JordanFALCON

23MW

Uneven terrain

nb88新博娱乐官方网址 Terrain slopes even higher than 20%, which required a customized mounting solution, adjusting the tables to the contour of the terrain with the purpose of reducing earth movements. In addition, fixed structure was designed for an allowable wind speed of 145mph (hurricane zone).

spain arrows

SpainCobra Solar Park

190MW

Mountain and hilly area

United States arrows

United StatesGrasshoper

103MW

nb88新博娱乐官方网址Uneven terrain

Chile arrows

ChileCapricornio

100MW

Hot and humid area

新博娱乐官网在线存款 新博瑞app 新博平台分数 新博官网棋牌游戏 nb88新博游戏登录 新博官网合作 新博网投官网 必威体育是正规的吗 新博体育 必威手机下载版